EX GERMANY STEAM TURBINE TO PLINTH, NEW ZEALAND 110 TONNE TURBINE AND ALL ANCILLARY PLANT.

Transportation ex factory by road to canal, transload to barge, ship to wharf Hamburg, wharf-side transfer to trailers for load into ocean vessel.
Movement to New Zealand install / arrange all plant inside building Hawera site.

click picture for more photos

EX UNITED STATES INSTALLED NEW ZEALAND TWO GAS TURBINE GENERATORS TO EXISTING SITE.

Uplift from packing company / factory two complete turbine generators and ancillary plant turbines / generators 29 tonne 38 tonne respectively, approx 900m3 ancillary plant.
New Zealand slot charter, air-ride transport to site and installed onto plinth between existing obstructing equipment.


EX UNITED STATES INSTALLED OUTBACK SOUTH AUSTRALIA THREE COMPRESSOR STATIONS. 3 x COMPRESSORS - 38 TONNE.

Uplifted ex factory, delivered 50 km, 180 km, and 245 km respectively North of Adelaide, with approximately 600m3 of ancillary plant per unit.

 

click picture for more photos

EX HOUSTON, DELIVERED ONTO PLINTHS THREE SITES AUSTRALIAN PIPELINE

2 x ANTONOV 124 aircraft charters plus one conventional seafreight movement.
Uplift ex factory, stage equipment at Houston International Airport, co-ordinate load / inventory / stow of two an124 aircraft.
One aircraft destination Melbourne, one aircraft destination Sydney. Payload each 98500 tonne.
Receive equipment on tarmac deliver into outback locations on air-ride equipment and install onto plinths.
Seafreight full kit for third compressor station, plus a further 750m3 for airfreighted units.

 

click picture for more photos