EX GERMANY STEAM
TURBINE TO PLINTH, NEW ZEALAND 110 TONNE TURBINE AND
ALL ANCILLARY PLANT.
Transportation ex factory by road to canal, transload
to barge, ship to wharf Hamburg, wharf-side transfer
to trailers for load into ocean vessel.
Movement to New Zealand install / arrange all
plant inside building Hawera site.
|
| click
picture for more photos |
|
|
 |
EX UNITED STATES INSTALLED NEW ZEALAND TWO GAS TURBINE GENERATORS TO EXISTING
SITE.
Uplift from packing company / factory two complete
turbine generators and ancillary plant turbines
/ generators 29 tonne 38 tonne respectively, approx
900m3 ancillary plant.
New Zealand slot charter, air-ride transport
to site and installed onto plinth between
existing obstructing equipment.
|
|
|
 |
EX UNITED STATES INSTALLED OUTBACK
SOUTH AUSTRALIA THREE COMPRESSOR STATIONS. 3 x
COMPRESSORS - 38 TONNE.
Uplifted ex factory, delivered 50 km, 180 km,
and 245 km respectively North of Adelaide, with
approximately 600m3 of ancillary plant per unit.
|
| click
picture for more photos |
|
|
 |
EX HOUSTON, DELIVERED ONTO
PLINTHS THREE SITES AUSTRALIAN PIPELINE
2 x ANTONOV 124 aircraft charters plus one conventional
seafreight movement.
Uplift ex factory, stage equipment at Houston
International Airport, co-ordinate load / inventory
/ stow of two an124 aircraft.
One aircraft destination Melbourne, one aircraft
destination Sydney. Payload each 98500 tonne.
Receive equipment on tarmac deliver into outback
locations on air-ride equipment and install onto
plinths.
Seafreight full kit for third compressor station,
plus a further 750m3 for airfreighted units.
|
| click
picture for more photos |
|